Here is a upstairs bathroom/office space remodel in progress. We removed the old cabinetry, countertops, flooring and 24" standard door, removed the header and framing to accommodate a 24" pocket door, set Hardi Backer board to 3/4" sub floor with thin set mortar and secured all to sub floor with Hardi-Screws every 8", floated seams with mesh tape, applied floor primer (the blue stuff) applied self level underlayment, and removed debris.
Removed Drywall
Pocket Door
Bathroom
Landing, Hall, Office
New AC Intake Vent
Base for Large Cabinets
Base for Small Cab
Tile Test Pattern
Vanity Cabinet (stain grade pine)
Small Vanity (in progress)
Installed Drywall (left of cabinet)
Removed Desk (sanded Walls)
Moved Electrical
Installed Double Switch for Fan & Light
Removed light bar, Furdown, Ran Wire for Sconces
Removed Fur, Installed Drywwall, Started Framing for Closet